Marchmont Road Edinburgh

Project Overview
This investment project will help reduce the risk of flooding to properties in the Marchmont area of Edinburgh by increasing the capacity of the sewer network.
The project is to be delivered by our alliance partners Caledonia Water Alliance and is expected to be completed by spring 2025.
At a glance
- Started: September 2022
- Flood prevention
- Delivered by Caledonia Water Alliance
- Approx completion spring 2025
Marchmont Road - Drone Photos
Progress photos showing roof on - April 24
What we are doing
The project involves installing new larger sewer pipes along sections of Marchmont Crescent and a small part of Marchmont Road, with an underground storm overflow tank which will be 15m wide by 20m deep
Two control kiosks to be installed adjacent to Warrender Park Terrace. See updated planning drawings for exact location
During construction there will be site cabins situated next to the location of the tank on the Bruntsfield Links
All planning drawings are available to view/download via the link further down the page
Why we are doing it
A number of properties in the area have previously been affected by sewer flooding.
The work being done here will increase the capacity of the local waste water network and will provide extra storage during heavy rainfall.
This improvement project will help reduce the risk of flooding in the area.

Road Closures
Details of traffic management in place from 5 May 2025
Update May 2025
We have connected the new sewer from Marchmont Crescent onto the existing sewer on Marchmont Road and are now reinstating the area next to Warrender Park Terrace.
A short section of Marchmont Crescent is to be closed to vehicle traffic for final survey work from Monday 5 May 2025 for up to five days.
We are extremely grateful to road users and customers for the patience and understanding they have shown over many months while we deliver this much needed project.
The risk of flooding will be significantly reduced and should bring peace of mind for many years to come during periods of extreme weather.
The majority of our site cabins located near the links off Warrender Park Terrace have been removed and the area will be seeded with wild meadow seed in June.
Two cabins and a small digger will remain until mid-May while the final landscaping works are undertaken. Fencing will be required to be up for a period beyond summer to allow the area to establish.

Bruntsfield Links Storm Tank - Drone
May 2023
Marchmont Project Documents
Click the button below to view information and planning docs for the project
View Documents Page